REQUEST FOR PROPOSALS
       
  RFP # Title Status
  2008-01 Meadow Village Water Well Completion & Water Line Design Engineering CLOSED
  2007-01 Big Sky Canyon Area Wastewater Feasibility Engineering Study CLOSED
  2007-02 Mountain/Meadow Water Line Project Construction Engineering Services CLOSED
  2007-03 Hidden Village Water & Sewer System Rehab Project CLOSED
       
Updated: 2/15/2008
RFP:  2008-01
Meadow Village Water Well Completion & Water Line Design Engineering

The District drilled 2 new water wells in the Meadow Village area of the public water supply system.  These wells were drilled, cased and capped.  This RFP is for engineering design, construction management, and resident project inspection services to design the connection of these new wells into the existing distribution system. 

This is a drinking water system project.  The District drilled and cased 2 new water wells in the Meadow Village area of Big Sky.  A new water main needs to be designed to connect the 2 wellheads to the existing water distribution system.  Pump test information conducted on the water wells showed that the static groundwater level is less than 25 feet in both wells.  As such, the District anticipates that these wells will need to have a chlorine disinfection system designed and installed before these wells can be placed into service.

The District is requesting proposals for design and construction phase engineering services for this project.  A secondary component to this project is an engineering report on recommendations for additional water distribution system disinfection methods and installations in anticipation of the Groundwater Rule impacts to the public water system.  The District will procure engineering services in accordance with 18-8-201 MCA.

Please see the full RFP by clicking one of the links below:


 
RFP:  2007-03
Hidden Village Water & Sewer System Rehab Project

This RFP is for construction management and resident project inspection services for the water and sewer rehabilitation project at the Hidden Village area of Big Sky.  Please see the full RFP by clicking one of the links below:

 
RFP:  2007-02
Mountain/Meadow Water Line Project Construction Engineering Services

This RFP is for construction management and resident inspector services for the new Mountain and Meadow water line project.  Please see the full RFP by clicking one of the links below:
 
 
RFP:  2007-01
Big Sky Canyon Area Wastewater Feasibility Engineering Study

The Big Sky County Water and Sewer District 363 is soliciting proposals for engineering services to assist in the preparation of a preliminary engineering report for a wastewater system improvement project to determine the feasibility of expanding central wastewater services to the canyon area of Big Sky.  At the sole discretion of the District, engineering services may be extended to design and construction administration services from preparing the bid package through completion of construction and project closeout.  All engineering services shall be in conformance with the requirements of the TSEP program, Department of Environmental requirements, and the various state and federal funding agencies.

 

Contact Information

I
f you have questions about any of the RFPs that are listed as OPEN, please contact the District at:

h

 


 


BIG SKY COUNTY WATER & SEWER DISTRICT NO. 363
PO Box 160670
561 Little Coyote Road
Big Sky, MT 59716

Tel. (406) 995-2660
Fax (406) 995-3053
                           
                            Email:       wsd363@3rivers.net
                            Website:  www.bigskywatersewer.com

< Click if you need to download Acrobat Reader (free)
 

 
Today's Date: 05/06/08